-
Outlines for Test areas I and J
- last edit: 10-Jul-2001
- comments: 0
-
Archaeologists Clean Area Before Stratum 2 is Exposed
- last edit: 10-Jul-2001
- comments: 0
-
Documentation Begins Before the Early Deposits are Cont...
- last edit: 10-Jul-2001
- comments: 0
-
Second Stratum Inspection and Clearing, Prior to Full E...
- last edit: 10-Jul-2001
- comments: 0
-
Prepared Excavation Area
- last edit: 10-Jul-2001
- comments: 0
-
Tarps Protect Excavation Area From Rain
- last edit: 10-Jul-2001
- comments: 0
-
Preparation of Trench L
- last edit: 30-Jul-2001
- comments: 0
-
Protecting the Excavation Area
- last edit: 05-Aug-2001
- comments: 0
-
Press Area of Field Lab
- last edit: 05-Aug-2001
- comments: 0
Album Description:
Preparing an excavation area at Legion Park starts with removing the overburden and then skim shoveling the exposed Stratum 2. Only after this surface is clean will further excavation commence.
Album Info:
Album Stats:
- Photos: 9
- Views: 2,532
- Downloads: 0
No comments so far...
To be able to leave a comment please Log in or Sign up.